Featured case study

  • Residential Client
  • Abersoch, Wales
  • 2013

Solution overview:

ATG Access were approached by a private residential client to protect their holiday home's parking area.

View full details

Featured case study

  • Hepworth Art Gallery
  • Wakefield, UK
  • 2011

Solution overview:

ATG Access needed to provide stylish access control certified by anti-terror specifications to protect the pedestrians and visitors of the new Hepworth Art Gallery in Wakefield.

View full details

Featured case study

  • Mercedes Benz
  • Birmingham
  • 2014

Solution overview:

Stainless steel, insurance recommended fixed bollards with refurbishment to existing arm barriers and the installation of speed calming measures to improve the car showroom's security

View full details

Featured case study

  • Wigan County Council
  • Wigan, UK
  • 2012

Solution overview:

Wigan CC required traffic management and pedestrian protection to a variety of recently refurbished areas within the town centre.

View full details

Featured case study

  • Heathrow Airport
  • London, UK
  • 2012

Solution overview:

ATG Access had to provide this unusual scheme with a traffic management system able to control driverless cars.

View full details

Featured case study

  • W Hotel, Qatar
  • Qatar
  • 2010

Solution overview:

ATG Access were approached to create vehicle access control for standard visitors and special VIP guests to the high profile hotel. The solution was VP100 automatic bollards and arm barriers.

View full details

Featured case study

  • Shanghai Expo Centre
  • Shanghai, China
  • 2010

Solution overview:

ATG Access were approached to control vehicle access and add a level of security to the main administration building at the world's largest Expo Centre.

View full details

Featured case study

  • George Town University
  • Doha, Qatar
  • 2011

Solution overview:

ATG Access’ local partner, ACEC was chosen to design and supply a range of access control bollards to secure the VIP entrance to the George Town University, Qatar.

View full details

Featured case study

  • All England Tennis Club, Wimbledon
  • Wimbledon, London
  • 2013

Solution overview:

ATG Access were approached to provide perimeter security for Wimbledon All England Tennis Club. The solution had to be strong whilst providing a soft and decorative aesthetic to the perimeter of such a prestigious location.

View full details

Featured case study

  • London Olympic Games 2012
  • Various UK Sites
  • 2012

Solution overview:

Historic, and high-profile, national venues were used as temporary, sporting arenas during London 2012.

View full details

Featured case study

  • New Doha International Airport
  • Doha, Qatar
  • 2011

Solution overview:

ATG Access will be manufacturing the perimeter security products to multiple areas of the vast site throughout the 4 year project.

View full details

Featured case study

  • Network Rail
  • Multiple Sites, UK
  • 2012

Solution overview:

ATG Access were approached due to their versitile high security product range to be a major supplier throughout a security upgrade across all main railway stations in the UK.

View full details

Featured case study

  • British Embassy, Athens
  • Athens
  • 2012

Solution overview:

The British Embassy in Athens was identified by the Foreign Commonwealth Office as an asset requiring upgraded perimeter security.

View full details

Featured case study

  • Arsenal Emirates Stadium
  • London, UK
  • 2009

Solution overview:

ATG Access were approached to find a suitable solution to upgrade the prestigious stadiums perimeter security. SP100 and SP1000 security bollards were chosen for the site.

View full details

Case Studies

Along with our comprehensive client list, we also have an extensive number of case studies both nationally and internationally.

ATG Access has a variety of projects where they have gone above and beyond the brief to provide clients with exceptional perimeter security solutions. With over 4,500 traffic management and high security installations worldwide, ATG Access has a growing project list.

Complex construction projects need highly trained engineers and technically advanced solutions. ATG Access is at forefront of these solutions.



Arrange a survey

Request a free site survey from ATG Access. Our security advisers are able to recommend the best site solution for your site.

Manual Bollard Case Studies

Case studies from a broad spectrum of clients covering a number of different applications. Read about how we have provided solutions to security needs just like yours.


Read more

Automatic Bollard Case Studies

ATG Access has installed traffic management and access control systems in sites across the globe ranging from the W Hotel in Abu Dhabi right through to Manchester city centre. Many effective systems have been installed.


Read more

High Security Case Studies

High security installations normally require a greater involvement from ATG Access in terms of advice, product design specifications and installation guidelines. Read about the different challenges we have overcome.


Read more