The Shard – Case Study

13 September 2016

Project Background The Shard of Glass is Europe’s tallest building standing 307m high (1016ft). The iconic building has been emb... More

W Hotel, Qatar

12 November 2015

The W-Hotel in Doha was identified by our local partner ACEC as an asset requiring upgraded perimeter security. Automatic bollard ... More

Housing Estate, Chester

12 November 2014

A new residential estate built by James Osborne Contractors in Tarvin, Chester needed both access roads securing to prevent unwant... More

College of North Atlantic, Qatar

12 October 2014

Working with ATG Access’s local partner in Qatar – Arabian Construction Engineering (ACEC), the University campus reci... More

Car Showroom Protection

12 January 2014

Mercedes Benz, Birmingham approached ATG Access to assess an old automatic bollard system which was controlling entry in and out o... More

GMR Energy Plant Site, Singapore

2 November 2013

The Singapore Government had given a contract to GMR Energy (S) Pte Ltd to design, build and own a 800 MW Power Plant at Jurong Is... More

Wimbledon Tennis Club

2 September 2013

On the perimeter of the All England Lawn Tennis Association – affectionately known as Wimbledon, ATG Access were contracted ... More

Residential Parking Protection

12 March 2013

Abersoch in Wales is a pretty costal village which attracts a lot of tourism in peak holiday season. There are 900 constant reside... More

Wigan City Council

12 November 2012

Wigan had previously installed a traffic management system but it was poor quality and because of this under utilised. As a result... More

Network Rail Sites

In July 2012 the government unveiled a £9.4bn spending package for upgrading the UK railway infrastructure across England and Wal... More